WHAT: Addition and renovation of existing waterfront cottage
CHALLENGE: Substantially increasing the square footage without putting any additional load on the fragile and protected bluff on the waterfront side.
STRATEGY: ____
LEFT: Ground Floor plan RIGHT: 2nd Floor plan